Daytona Seawall RepairCall (386) 333-6570

Building a new dock in Daytona Beach and coastal Volusia County

A newly built wooden dock with light-colored boards and round pilings, running from a concrete seawall out to a small T-shaped platform on a wide calm river, with houses and docks on the far shore

A new private dock here has more rules than most home projects: a state size limit, a city size limit, the county's manatee plan, and a building permit. Angi's 2026 national figures put a typical dock at $4,074 to $26,021, averaging about $15,048.

Call (386) 333-6570Rather not call? Send the details

Calls are answered weekdays, 9 to 6. After hours, leave your name, address and what's going on, and you'll get a call back first thing the next business day.

Side view of a fixed private dock running out from a seawall over the water. Round pilings are driven into the bottom in pairs. Beams called stringers run along the tops of the pilings, and deck boards lie across the stringers. At the far end, a boat lift sits between its own pilings. The water level changes with the tide.deck boardsstringerspilings driven into the bottomboat liftseawallhigh tidelow tide
The parts of a fixed dock. Pilings driven into the bottom carry everything; stringers run between them and the deck boards sit on top. The deck is set high enough to stay above high tide, and the boat lift at the end gets its own heavier pilings.

How big can a dock be?

Two limits apply: the state's, and your city's.

Dock size limits in the January 2020 Volusia County memo (check current code before building)
WhereLimit
Unincorporated Volusia (incl. Ormond-by-the-Sea)750 sq ft
Daytona Beach500 sq ft
Daytona Beach Shores400 sq ft
Holly Hill800 sq ft
Ormond Beach660 sq ft in the Tomoka Marsh preserve, 680 elsewhere
Ponce Inlet1,000 sq ft for all structures, more for long frontage
Port Orange560 sq ft for the end platform and boathouse

Under Florida Statutes 403.813, a private dock of up to 1,000 square feet over the water is exempt from a state environmental permit, or 500 square feet in an Outstanding Florida Water. In this area that means Spruce Creek, with Strickland Bay and Turnbull Bay, and the Tomoka River. Boat lifts and roofs count toward that total.

Cities set their own caps, and most are smaller than the state's. The table above comes from a January 2020 Volusia County memo comparing them; South Daytona and New Smyrna Beach weren't included. Codes change, so the contractor checks the current one before drawing anything, and the smaller of the two limits is the one that counts.

What other rules apply to a new dock?

  1. Manatee plan: A single-family home gets one structure with one or two slips. A new one pays a one-time $412.45 county fee and needs a Letter of Compliance before work starts.
  2. State-owned bottom: Where the bottom belongs to the state, one small private dock usually needs a letter of consent, and the dock must sit at least 25 feet inside your side property lines.
  3. Building permit: From your city, or from the county outside city limits.

In Ormond Beach, the city's checklist asks for the county's manatee letter, any state or Army Corps permits that apply, and turbidity barrier photos before it issues the permit.

Wood or composite: what is a dock built from?

Most docks here stand on pilings driven into the bottom, with beams running between them and deck boards on top. Wood has a hard life in salt water. Florida Sea Grant warns that treated lumber that lasts 20 to 30 years elsewhere can fail in under 10 in Florida because of marine borers, animals that tunnel into wood below the waterline. Plastic piling wraps keep them out.

For the deck, Angi describes pressure-treated wood as cheaper but needing regular sealing, and composite as costing more up front while resisting rot with less upkeep.

How much does a new dock cost?

Angi's 2026 national average is about $15,048, with most homeowners paying between $4,074 and $26,021. A fixed dock on pilings runs roughly $20 to $40 a square foot. A boat lift adds $2,000 to $20,000, and removing an old dock first adds about $250 to $1,000.

So a 400-square-foot piling dock in Daytona Beach Shores might land around $8,000 to $16,000 before a lift, permits and the $412.45 manatee fee. See the cost guide and boat lifts.

Common questions

Do I need a permit for a new dock?

Yes, a local building permit, and usually the county's manatee Letter of Compliance. The state environmental permit is often exempt for small private docks, but not always.

How long does a dock last?

HomeGuide gives a well-kept dock 10 to 25 years. Deck boards usually need replacing sooner, and wood pilings without wraps can fail early in salt water.

Can I have two docks?

The county's manatee plan allows a single-family home one structure with one or two boat slips.

Sources: Florida Statutes 403.813, permits not required (2026) (source); Florida Administrative Code 62-302.700, Outstanding Florida Waters (Spruce Creek, Tomoka River) (source); Florida Administrative Code 62-330.051, exempt docks and boat lifts (source); Volusia County, Dock regulations memo (Jan 2020) (source); Volusia County, Manatee protection plan: single-family residence (source); Florida Administrative Code 18-21.004, state-owned submerged lands (25-foot setback) (source); Florida Administrative Code 18-21.005, letter of consent for a private dock (source); City of Ormond Beach, Dock and seawall permit checklist (Feb 2026) (source); Florida Sea Grant, Wood-boring marine and estuarine animals in Florida (1990) (source); Angi, How much does it cost to build a dock? (Sept 2026) (source); HomeGuide, Boat dock repair costs (Apr 2024) (source).

Last reviewed November 1, 2026.

Rather not call? Send the details

A local seawall and dock pro will call you back.

Call (386) 333-6570

Answered weekdays 9 to 6. After hours, leave a message. Or send the details